{"id":1606,"date":"2025-06-15T10:00:00","date_gmt":"2025-06-15T07:00:00","guid":{"rendered":"https:\/\/emcekare.seoajansi.net\/projects\/ankara-chamber-of-industry-aso-2nd-region-substation-mv-works-and-energy-monitoring-turnkey\/"},"modified":"2025-06-15T10:00:00","modified_gmt":"2025-06-15T07:00:00","slug":"ankara-chamber-of-industry-aso-2nd-region-substation-mv-works-and-energy-monitoring-turnkey","status":"publish","type":"referansprojeleri","link":"https:\/\/emcekare.seoajansi.net\/en\/projects\/ankara-chamber-of-industry-aso-2nd-region-substation-mv-works-and-energy-monitoring-turnkey\/","title":{"rendered":"Ankara Chamber of Industry (ASO) \u2013 2nd Region Substation MV Works and Energy Monitoring (Turnkey)"},"content":{"rendered":"<p>Installation of the substation, including civil works, electrification and energy monitoring.<\/p>\n<h3>Scope of Work<\/h3>\n<ul>\n<li>Supply and installation of MV cells<\/li>\n<li>Integration of the added cells into the existing Siemens Power SCADA<\/li>\n<li>Siemens A8000 RTU, 2.000 tags<\/li>\n<\/ul>\n<h3>Project Information<\/h3>\n<ul>\n<li><strong>Client:<\/strong> Ankara Sanayi Odas\u0131<\/li>\n<li><strong>Job Description:<\/strong> 2nd Region Substation MV Works and Energy Monitoring (Turnkey)<\/li>\n<li><strong>Location:<\/strong> Ankara<\/li>\n<li><strong>Date:<\/strong> 2025 \u2013 Ongoing<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Installation of the substation, including civil works, electrification and energy monitoring.<\/p>\n","protected":false},"featured_media":1060,"template":"","proje_kategorisi":[38],"class_list":["post-1606","referansprojeleri","type-referansprojeleri","status-publish","has-post-thumbnail","hentry","proje_kategorisi-energy"],"proje_meta":{"_project_year":"2025 \u2013 Ongoing","_project_location":"Ankara","_project_client":"Ankara Sanayi Odas\u0131","_project_details":"Installation of the substation, including civil works, electrification and energy monitoring\nSupply and installation of MV cells\nIntegration of the added cells into the existing Siemens Power SCADA\nSiemens A8000 RTU, 2.000 tags"},"_links":{"self":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri\/1606","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri"}],"about":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/types\/referansprojeleri"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media\/1060"}],"wp:attachment":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media?parent=1606"}],"wp:term":[{"taxonomy":"proje_kategorisi","embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/proje_kategorisi?post=1606"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}