{"id":1641,"date":"2021-06-15T10:00:00","date_gmt":"2021-06-15T07:00:00","guid":{"rendered":"https:\/\/emcekare.seoajansi.net\/projects\/en-ez-construction-dsi-atabey-pumping-station-electrical-contracting-automation-and-mechanical-works\/"},"modified":"2021-06-15T10:00:00","modified_gmt":"2021-06-15T07:00:00","slug":"en-ez-construction-dsi-atabey-pumping-station-electrical-contracting-automation-and-mechanical-works","status":"publish","type":"referansprojeleri","link":"https:\/\/emcekare.seoajansi.net\/en\/projects\/en-ez-construction-dsi-atabey-pumping-station-electrical-contracting-automation-and-mechanical-works\/","title":{"rendered":"En-Ez Construction \u2013 DS\u0130 Atabey Pumping Station: Electrical Contracting, Automation and Mechanical Works"},"content":{"rendered":"<p>Turnkey delivery of all mechanical, MV\/LV\/IT and automation works of the facility.<\/p>\n<h3>Scope of Work<\/h3>\n<ul>\n<li>34,500 V MV cells<\/li>\n<li>6,300 V MV cells<\/li>\n<li>8,000 kVA transformer (34,000 V \/ 6,300 V)<\/li>\n<li>4 \u00d7 6,300 V MV soft starters<\/li>\n<li>4 \u00d7 1.5 MW MV pump motors<\/li>\n<li>Schneider PLC and SCADA system, 5,000 tags<\/li>\n<\/ul>\n<h3>Project Information<\/h3>\n<ul>\n<li><strong>Client:<\/strong> En-Ez \u0130n\u015f. San. Tic. A.\u015e.<\/li>\n<li><strong>Job Description:<\/strong> DS\u0130 Atabey Pumping Station: Electrical Contracting, Automation and Mechanical Works<\/li>\n<li><strong>Location:<\/strong> Isparta<\/li>\n<li><strong>Date:<\/strong> 2021<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Turnkey delivery of all mechanical, MV\/LV\/IT and automation works of the facility.<\/p>\n","protected":false},"featured_media":1041,"template":"","proje_kategorisi":[40],"class_list":["post-1641","referansprojeleri","type-referansprojeleri","status-publish","has-post-thumbnail","hentry","proje_kategorisi-water-wastewater"],"proje_meta":{"_project_year":"2021","_project_location":"Isparta","_project_client":"En-Ez \u0130n\u015f. San. Tic. A.\u015e.","_project_details":"Turnkey delivery of all mechanical, MV\/LV\/IT and automation works of the facility\n34,500 V MV cells\n6,300 V MV cells\n8,000 kVA transformer (34,000 V \/ 6,300 V)\n4 \u00d7 6,300 V MV soft starters\n4 \u00d7 1.5 MW MV pump motors\nSchneider PLC and SCADA system, 5,000 tags"},"_links":{"self":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri\/1641","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri"}],"about":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/types\/referansprojeleri"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media\/1041"}],"wp:attachment":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media?parent=1641"}],"wp:term":[{"taxonomy":"proje_kategorisi","embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/proje_kategorisi?post=1641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}