{"id":1667,"date":"2018-06-15T10:00:00","date_gmt":"2018-06-15T07:00:00","guid":{"rendered":"https:\/\/emcekare.seoajansi.net\/projects\/schneider-electric-haci-qabul-agricultural-irrigation-electrical-infrastructure-and-automation-works\/"},"modified":"2018-06-15T10:00:00","modified_gmt":"2018-06-15T07:00:00","slug":"schneider-electric-haci-qabul-agricultural-irrigation-electrical-infrastructure-and-automation-works","status":"publish","type":"referansprojeleri","link":"https:\/\/emcekare.seoajansi.net\/en\/projects\/schneider-electric-haci-qabul-agricultural-irrigation-electrical-infrastructure-and-automation-works\/","title":{"rendered":"Schneider Electric \u2013 Hac\u0131 Qabul Agricultural Irrigation Electrical Infrastructure and Automation Works"},"content":{"rendered":"<p>All LV and automation works of the facility, carried out jointly with Schneider Electric.<\/p>\n<h3>Scope of Work<\/h3>\n<ul>\n<li>For 1 pumping station (76 pivot water supplies)<\/li>\n<li>LV panels<\/li>\n<li>MV\/LV VFD MCCs<\/li>\n<li>25,000 m of power and control cable<\/li>\n<li>Schneider redundant PLC and redundant SCADA system, 5,000 tags<\/li>\n<\/ul>\n<h3>Project Information<\/h3>\n<ul>\n<li><strong>Client:<\/strong> Schneider Electric \/ Agrodairy<\/li>\n<li><strong>Job Description:<\/strong> Hac\u0131 Qabul Agricultural Irrigation Electrical Infrastructure and Automation Works<\/li>\n<li><strong>Location:<\/strong> Azerbaijan<\/li>\n<li><strong>Date:<\/strong> 2018<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>All LV and automation works of the facility, carried out jointly with Schneider Electric.<\/p>\n","protected":false},"featured_media":1051,"template":"","proje_kategorisi":[40],"class_list":["post-1667","referansprojeleri","type-referansprojeleri","status-publish","has-post-thumbnail","hentry","proje_kategorisi-water-wastewater"],"proje_meta":{"_project_year":"2018","_project_location":"Azerbaijan","_project_client":"Schneider Electric \/ Agrodairy","_project_details":"All LV and automation works of the facility, carried out jointly with Schneider Electric\nFor 1 pumping station (76 pivot water supplies)\nLV panels\nMV\/LV VFD MCCs\n25,000 m of power and control cable\nSchneider redundant PLC and redundant SCADA system, 5,000 tags"},"_links":{"self":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri\/1667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri"}],"about":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/types\/referansprojeleri"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media\/1051"}],"wp:attachment":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media?parent=1667"}],"wp:term":[{"taxonomy":"proje_kategorisi","embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/proje_kategorisi?post=1667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}