{"id":1683,"date":"2017-06-15T10:00:00","date_gmt":"2017-06-15T07:00:00","guid":{"rendered":"https:\/\/emcekare.seoajansi.net\/projects\/bulbuloglu-crane-derince-safi-port-sodium-bicarbonate-storage-plant-silo-and-belt-conveyor-automation\/"},"modified":"2017-06-15T10:00:00","modified_gmt":"2017-06-15T07:00:00","slug":"bulbuloglu-crane-derince-safi-port-sodium-bicarbonate-storage-plant-silo-and-belt-conveyor-automation","status":"publish","type":"referansprojeleri","link":"https:\/\/emcekare.seoajansi.net\/en\/projects\/bulbuloglu-crane-derince-safi-port-sodium-bicarbonate-storage-plant-silo-and-belt-conveyor-automation\/","title":{"rendered":"B\u00fclb\u00fclo\u011flu Crane \u2013 Derince Safi Port Sodium Bicarbonate Storage Plant: Silo and Belt Conveyor Automation"},"content":{"rendered":"<p>Turnkey delivery of all MV\/LV\/IT and automation works of the facility.<\/p>\n<h3>Scope of Work<\/h3>\n<ul>\n<li>PLC and MCC panels<\/li>\n<li>50,000 m of power and control cable<\/li>\n<li>10 tons of heavy-duty cable trays<\/li>\n<li>Siemens PLC system and redundant SCADA server-client architecture, 20,000 tags<\/li>\n<\/ul>\n<h3>Project Information<\/h3>\n<ul>\n<li><strong>Client:<\/strong> B\u00fclb\u00fclo\u011flu Vin\u00e7 San. ve Tic. A.\u015e.<\/li>\n<li><strong>Job Description:<\/strong> Derince Safi Port Sodium Bicarbonate Storage Plant: Silo and Belt Conveyor Automation<\/li>\n<li><strong>Location:<\/strong> Kocaeli<\/li>\n<li><strong>Date:<\/strong> 2017<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Turnkey delivery of all MV\/LV\/IT and automation works of the facility.<\/p>\n","protected":false},"featured_media":1531,"template":"","proje_kategorisi":[49],"class_list":["post-1683","referansprojeleri","type-referansprojeleri","status-publish","has-post-thumbnail","hentry","proje_kategorisi-cement-minerals"],"proje_meta":{"_project_year":"2017","_project_location":"Kocaeli","_project_client":"B\u00fclb\u00fclo\u011flu Vin\u00e7 San. ve Tic. A.\u015e.","_project_details":"Turnkey delivery of all MV\/LV\/IT and automation works of the facility\nPLC and MCC panels\n50,000 m of power and control cable\n10 tons of heavy-duty cable trays\nSiemens PLC system and redundant SCADA server-client architecture, 20,000 tags"},"_links":{"self":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri\/1683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri"}],"about":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/types\/referansprojeleri"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media\/1531"}],"wp:attachment":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media?parent=1683"}],"wp:term":[{"taxonomy":"proje_kategorisi","embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/proje_kategorisi?post=1683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}