{"id":1688,"date":"2016-06-15T10:00:00","date_gmt":"2016-06-15T07:00:00","guid":{"rendered":"https:\/\/emcekare.seoajansi.net\/projects\/dsi-gelibolu-drinking-water-treatment-plant-electrical-and-automation-works\/"},"modified":"2016-06-15T10:00:00","modified_gmt":"2016-06-15T07:00:00","slug":"dsi-gelibolu-drinking-water-treatment-plant-electrical-and-automation-works","status":"publish","type":"referansprojeleri","link":"https:\/\/emcekare.seoajansi.net\/en\/projects\/dsi-gelibolu-drinking-water-treatment-plant-electrical-and-automation-works\/","title":{"rendered":"DS\u0130 Gelibolu Drinking Water Treatment Plant Electrical and Automation Works"},"content":{"rendered":"<p>Turnkey delivery of all MV\/LV\/IT and automation works of the facility.<\/p>\n<h3>Scope of Work<\/h3>\n<ul>\n<li>MV cells<\/li>\n<li>2 \u00d7 1,600 kVA transformers<\/li>\n<li>2 \u00d7 diesel generators<\/li>\n<li>Main distribution (ADP) and MCC panels<\/li>\n<li>50,000 m of power and control cable<\/li>\n<li>Schneider DCS, redundant SCADA server-client architecture, 20,000 tags<\/li>\n<\/ul>\n<h3>Project Information<\/h3>\n<ul>\n<li><strong>Client:<\/strong> DS\u0130<\/li>\n<li><strong>Job Description:<\/strong> DS\u0130 Gelibolu Drinking Water Treatment Plant Electrical and Automation Works<\/li>\n<li><strong>Location:<\/strong> \u00c7anakkale<\/li>\n<li><strong>Date:<\/strong> 2016<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Turnkey delivery of all MV\/LV\/IT and automation works of the facility.<\/p>\n","protected":false},"featured_media":1534,"template":"","proje_kategorisi":[40],"class_list":["post-1688","referansprojeleri","type-referansprojeleri","status-publish","has-post-thumbnail","hentry","proje_kategorisi-water-wastewater"],"proje_meta":{"_project_year":"2016","_project_location":"\u00c7anakkale","_project_client":"DS\u0130","_project_details":"Turnkey delivery of all MV\/LV\/IT and automation works of the facility\nMV cells\n2 \u00d7 1,600 kVA transformers\n2 \u00d7 diesel generators\nMain distribution (ADP) and MCC panels\n50,000 m of power and control cable\nSchneider DCS, redundant SCADA server-client architecture, 20,000 tags"},"_links":{"self":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri\/1688","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri"}],"about":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/types\/referansprojeleri"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media\/1534"}],"wp:attachment":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media?parent=1688"}],"wp:term":[{"taxonomy":"proje_kategorisi","embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/proje_kategorisi?post=1688"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}