{"id":1710,"date":"2014-06-15T10:00:00","date_gmt":"2014-06-15T07:00:00","guid":{"rendered":"https:\/\/emcekare.seoajansi.net\/projects\/silopi-electric-hezil-stream-12-x-220-kw-pump-lift-station-electrical-plc-and-scada-systems\/"},"modified":"2014-06-15T10:00:00","modified_gmt":"2014-06-15T07:00:00","slug":"silopi-electric-hezil-stream-12-x-220-kw-pump-lift-station-electrical-plc-and-scada-systems","status":"publish","type":"referansprojeleri","link":"https:\/\/emcekare.seoajansi.net\/en\/projects\/silopi-electric-hezil-stream-12-x-220-kw-pump-lift-station-electrical-plc-and-scada-systems\/","title":{"rendered":"Silopi Electric \u2013 Hezil Stream 12 \u00d7 220 kW Pump Lift Station Electrical, PLC and SCADA Systems"},"content":{"rendered":"<p>Turnkey delivery of the LV\/IT and automation works of the facility.<\/p>\n<h3>Scope of Work<\/h3>\n<ul>\n<li>For 2 lift stations:<\/li>\n<li>MCC and PLC panels<\/li>\n<li>Main distribution panels (ADP)<\/li>\n<li>Diesel generators and generator distribution panels<\/li>\n<li>22.000 m of power and control cable<\/li>\n<li>Schneider PLC and central SCADA system, 3,000 tags<\/li>\n<\/ul>\n<h3>Project Information<\/h3>\n<ul>\n<li><strong>Client:<\/strong> Silopi Elektrik \u00dcretim A.\u015e.<\/li>\n<li><strong>Job Description:<\/strong> Hezil Stream 12 \u00d7 220 kW Pump Lift Station Electrical, PLC and SCADA Systems<\/li>\n<li><strong>Location:<\/strong> \u015e\u0131rnak<\/li>\n<li><strong>Date:<\/strong> 2014<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Turnkey delivery of the LV\/IT and automation works of the facility.<\/p>\n","protected":false},"featured_media":1552,"template":"","proje_kategorisi":[40],"class_list":["post-1710","referansprojeleri","type-referansprojeleri","status-publish","has-post-thumbnail","hentry","proje_kategorisi-water-wastewater"],"proje_meta":{"_project_year":"2014","_project_location":"\u015e\u0131rnak","_project_client":"Silopi Elektrik \u00dcretim A.\u015e.","_project_details":"Turnkey delivery of the LV\/IT and automation works of the facility\nFor 2 lift stations:\nMCC and PLC panels\nMain distribution panels (ADP)\nDiesel generators and generator distribution panels\n22.000 m of power and control cable\nSchneider PLC and central SCADA system, 3,000 tags"},"_links":{"self":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri\/1710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/referansprojeleri"}],"about":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/types\/referansprojeleri"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media\/1552"}],"wp:attachment":[{"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/media?parent=1710"}],"wp:term":[{"taxonomy":"proje_kategorisi","embeddable":true,"href":"https:\/\/emcekare.seoajansi.net\/en\/wp-json\/wp\/v2\/proje_kategorisi?post=1710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}